From Fire Damage to a Completely New Roof: How Glick Roofing Rebuilt This Structure from the Ground Up

When a fire strikes a commercial property, the aftermath can leave a building unsafe, unstable, and impossible to occupy. That’s exactly what happened to this facility — and what started as severe damage turned into an opportunity to rebuild stronger than ever.

At Glick Roofing Systems, we specialize not just in repairs but in complete roof replacements when a building’s structure demands a fresh start. This project required exactly that: a full tear-off, structural rebuild, and the installation of a brand new 60 mil Carlisle TPO roofing system built to last.

In today’s blog, we’re walking you through the transformation step-by-step.

blank


Before: Fire Damage Left the Roof Unsafe

After the fire, the roof structure was compromised beyond repair. The existing materials had to be fully removed before any new work could begin. Burned decking, damaged insulation, and weakened structural components made the entire roof system unstable.

Safety is always the top priority, so our first step was ensuring the area was secure enough for our team to perform the full tear-off and reconstruction.

 


Before: Internal Structural Damage

Inside the building, the steel decking and bar joists had been severely weakened from heat exposure. Structural components like these support the entire roofing system, so replacing them was non-negotiable.

This phase required collaboration between our roofing team and structural specialists to make sure the building was rebuilt the right way — not patched, not covered up, but reconstructed for long-term stability.


After: A Brand New TPO Roofing System

Once the interior structure was rebuilt, we installed a completely new 60 mil Carlisle TPO roofing system. This upgrade provides:

  • Enhanced durability

  • Improved energy efficiency

  • Stronger long-term defense against weather and UV exposure

  • Low maintenance requirements for the building owner

This wasn’t a repair. It wasn’t a facelift. It was a total transformation.


After: Reinforced Structural Integrity

New bar joists and steel decking were installed throughout the interior. This gave the building a clean slate — and a stronger one than before. With the structure fully rebuilt, the new roof could perform exactly as it was designed to.

The end result? A safer, stronger, watertight building that’s ready for years of reliable use.


Project Conclusion: A Complete Rebuild from the Inside Out

What began as a fire-damaged, unstable structure is now home to a completely new roofing system and reinforced internal framework. This project showcases the difference between surface-level fixes and a true professional rebuild.

At Glick Roofing Systems, we don’t just put on new roofing materials — we ensure the entire system is built to perform.

If your building has experienced major damage or structural issues, our team is here to walk you through your options and help you rebuild with confidence.